Biogas Turbine Flow Meter (LWGQ Series)
Custody-Grade Biomethane / RNG (renewable natural gas) Billing After the Upgrading Skid
Accuracy ±0.5 / 1.0 / 1.5 % of rate options
Pipe DN50 to DN200
Turndown up to 1:30 (top G-class)
- Titanium body for residual H₂S tolerance (4–20 ppm post-scrub excursions)
- 1.6 to 10 MPa metric, ANSI 150 / 300 / 600 LB flange options
- T+P (temperature and pressure) compensation built-in; corrected volume on 4-20 mA loop

LWGQ build for post-upgrade biomethane fiscal service; RNG (renewable natural gas) grid-injection and off-taker invoice flow measurement after H₂S scrubbing, CO₂ separation, and glycol drying. H₂S thresholds: ≤20 ppm at inlet (meter binding cap), ≤10 ppm typical delivered, 4 ppm the 316L-to-titanium crossover. T+P compensation outputs corrected volume on 4-20 mA. Raw biogas at digester outlet is wet and out-of-binding; go to biogas-swirl.
Benefits
- Custody-grade ±0.5 % rate: factory K-factor (pulses-per-volume calibration) for RNG grid-injection billing and off-taker invoice settlement.
- Titanium body anti-corrosive: tolerates residual H₂S 4–20 ppm at the meter inlet without 316L pitting; standard delivered biomethane targets ≤10 ppm.
- 1:30 turndown: captures off-peak biomethane production swings narrow-turndown meters miss.
- T+P compensation built-in: corrected volume on 4-20 mA, no external multivariable.
- Dual hazardous-area: Ex d II CT6 Gb + Ex ia II CT6 Ga for skid + classified delivery points.
- Multi-output: pulse, 4-20 mA, RS-485 Modbus, HART, GPRS / 4G for SCADA + utility AMR.
- Lead time 5–7 business days from the factory.
Typical applications
Four post-upgrade biomethane applications where LWGQ is the fiscal-standard pick.
RNG grid-injection custody billing
Fence meter on the biomethane-to-grid skid. Reading is the fiscal-revenue basis under the utility tariff; T+P corrects volume to reference conditions.
RNG off-taker purchase metering
Custody point at the off-taker delivery flange. Volume from the LWGQ plus heat content from inline GC drives the invoice for RNG purchase.
WWTP biomethane to CHP gas turbines
WWTP that upgrades digester biogas and feeds dedicated power turbines. Internal custody meter for energy accounting and CHP-bonus reporting.
Landfill-gas energy-revenue settlement
Landfill-gas projects upgrading to pipeline-quality biomethane. Custody meter at the upgrader outlet for renewable-fuel credit and off-taker invoice.
Specifications
| Measurement principle | Velocity-type turbine with magnetic-pickup pulse output |
|---|---|
| Pipe size range | DN50 – DN200 (2″ – 8″) standard build for biomethane service |
| Accuracy | ±0.5 % of rate / ±1.0 % of rate / ±1.5 % of rate (factory K-factor calibration with each meter) |
| Turndown | 1:10 to 1:30 (depending on G-class flow rating selection) |
| Working pressure | 1.6 / 2.5 / 4.0 / 6.3 / 10 MPa metric, ANSI 150 LB / 300 LB / 600 LB |
| Medium temperature | −25 to +80 °C |
| Ambient range | −20 to +65 °C, 5 % to 90 % RH non-condensing, 86 to 106 kPa atmospheric |
| Body material | Titanium alloy standard (residual H₂S tolerance), 316L option when H₂S < 4 ppm at final polishing bed |
| Sensor material | 316L / titanium alloy |
| Medium | Post-upgrade biomethane / RNG: ≥95 % CH₄, ≤10 ppm H₂S delivered, ≤4 ppm H₂O, dry single-phase |
| Out-of-binding | Raw biogas, wet gas, condensate-bearing flow, 2-phase service; go to biogas-swirl (LUXB) |
| Compensation | None / temperature / pressure (T+P standard for fiscal billing) |
| Output signals | Pulse 3-wire, 4-20 mA 2-wire / 3-wire, RS-485 Modbus RTU, HART, GPRS / 4G IoT |
| Power supply | 24 V DC standard, 3.6 V lithium battery option for remote skid AMR |
| Display | Instantaneous flow, cumulative volume, temperature, pressure on integrated LCD |
| Data logging | Daily log + timed-interval log (audit-trail retrievable for fiscal reconciliation) |
| Transmission distance | Pulse 3-wire ≤ 300 m, 4-20 mA 2-wire ≤ 1500 m (load ≤ 500 Ω), RS-485 / HART ≤ 1200 m |
| Ingress protection | IP65 / IP66 |
| Hazardous area | Ex d II CT6 Gb (flameproof) + Ex ia II CT6 Ga (intrinsically safe) |
| Approvals | EMC 2014/30/EU (Annex II), ISO 9001 calibration certificate with each meter |
Installation
Five install rules. Pre-condition: gas must be dry single-phase with H₂S ≤ 20 ppm post-scrubbing; raw / wet biogas is out-of-binding.
- Verify dry biomethane pre-condition before install Confirm the upstream upgrading skid is in normal service: H₂S ≤ 20 ppm at the meter inlet, dew-point margin > 15 K, no condensate carry-over. Raw biogas (wet, >100 ppm H₂S) is out-of-binding; go to biogas-swirl. Wet-gas service voids the K-factor.
- Filter upstream of every meter on biomethane service Install a gas filter upstream of the meter to catch carry-over from amine / membrane / PSA upstream. Never connect the filter directly to the meter inlet flange; debris damages the rotor bearing and shifts the K-factor.
- Horizontal install with the housing arrow aligned to flow The LWGQ supports horizontal install only; vertical mount is not permitted. The flow direction arrow on the housing must match line flow. The pipe must run full of biomethane at the meter location.
- Maintain ≥ 3 DN upstream and ≥ 1 DN downstream straight pipe The integrated upstream flow conditioner accepts the 3 DN minimum upstream of any elbow or valve, and 1 DN minimum downstream. Tighter installations distort the velocity profile and bias the K-factor low.
- Install isolation valves and a bypass loop on both sides Upstream and downstream isolation valves let the meter come out of service for inspection without shutting the RNG injection point. The bypass loop stays closed during normal service and opens only during maintenance windows.
Frequently asked questions
Need help sizing a biomethane custody build?
Send line size, P/T, biomethane composition, cert need. Reply in 1 day; lead time 5–7 business days.