Flow Nozzle Flow Meter
Erosion-resistant primary for high-velocity steam.
DN50 to DN1200 · ±0.5 % of flow / ±0.1 % repeatability
PN0.6–PN42 MPa · −200 to +800 °C
ISO 5167-3 / GB/T 2624 conformant
- Superheated steam, power-station main steam, high-velocity gas, refinery custody
- Rounded inlet resists edge erosion that limits orifice life on dirty or high-velocity service
- ~30–40 % permanent ΔP loss; between orifice 50–70 % and classical venturi 10–15 %
Rounded inlet · cylindrical throat · corner / D-D/2 / flange taps
ISO 5167-3 / GB/T 2624 long-radius profile shown
Flow nozzle primary elements measure clean gas, superheated steam, and natural-gas flow on DN50 to DN1200 pipe at pressures up to PN42 MPa and temperatures from −200 to +800 °C. The rounded inlet generates a square-law ΔP; an external DP transmitter reads it and square-root-extracts the flow per ISO 5167-3 / GB/T 2624. Accuracy is ±0.5 % of flow, repeatability ±0.1 %; designed per the conventions used in ASME PTC 6 main-steam practice.
Benefits
- Erosion-resistant rounded inlet: no sharp edge to round off; discharge-coefficient drift that limits orifice life on high-velocity gas, superheated steam, or dust-laden flue gas is much slower.
- Mid-range permanent ΔP loss: ~30–40 % of measured, between square-edge orifice 50–70 % and classical venturi 10–15 %.
- DN50–DN1200, PN0.6–PN42 MPa, −200 to +800 °C; cryogenic LNG / LH2 through superheated steam in one element.
- ±0.5 % of flow per ISO 5167-3 wet-cal, ±0.1 % repeatability; system accuracy depends on DP transmitter + install conformance.
- ISO 5167-3 / GB/T 2624 conventions used in ASME PTC 6 practice (designed-per, not independently PTC 6 certified); long-radius and ISA-1932 profiles supplied by quote.
- Transmitter-agnostic: pair with our factory 4-20 mA / HART DP transmitter or reuse Rosemount 3051, Yokogawa EJA, Honeywell ST3000.
- Lead time 5–7 business days from the factory.
Configure your build.
Pick DN, working pressure, profile, material, connection, and transmitter pairing. The configurator returns the PF-LG-PZ model code and an order-of-magnitude unit price; engineering replies with a sized quote (beta ratio, ΔP range, expected accuracy) within one business day.
Your Configuration
✓ ISO 9001 wet-flow calibration cert
✓ Reply within 4 business hours
Typical applications
Four applications where erosion resistance decides the primary.
Power-station main steam
Superheated steam header on coal or combined-cycle units at 540 °C and PN10 to PN25 MPa; the rounded profile holds where an orifice edge erodes.
Refinery hot-oil and gas headers
Reformer flue gas, FCC overhead, hot-oil heater coils; 12CrMo or Cr5Mo wetted plus the nozzle profile resist the abrasion and thermal cycling.
EPC bid-spec ISO 5167 / ASME PTC 6
New-build projects with bid-spec calling for a long-radius nozzle. Ships with wet-cal cert, beta ratio, and discharge coefficient.
Cryogenic LNG, LH2, LOX feed
LNG terminal feed, hydrogen precooling loop, ASU oxygen column; stainless wetted parts survive −200 °C with impulse-line heat-tracing on the ambient side.
Specifications
| Measurement principle | Differential-pressure primary element; rounded inlet contracts the flow into a short cylindrical throat, generates a square-law ΔP read by an external DP transmitter and square-root-extracted to volumetric or mass flow per ISO 5167-3 / GB/T 2624 |
|---|---|
| Pipe size range | DN50 to DN1200 |
| Pressure up to | PN0.6 / PN1.0 / PN1.6 / PN2.5 / PN4.0 / PN6.4 / PN10 / PN16 / PN25 / PN42 MPa |
| Medium temperature | −200 to +800 °C |
| Accuracy | ±0.5 % of flow per ISO 5167-3 wet-cal at the factory loop |
| Repeatability | ±0.1 % typical per ISO 5167 conformant install |
| Profile options | Long-radius nozzle (ISO 5167-3) / ISA-1932 nozzle / venturi-nozzle hybrid; selected by quote based on velocity, head budget, and DN |
| Beta ratio | 0.30 to 0.75 (factory-sized by quote against fluid composition, flowing P + T, and DP-transmitter URL) |
| Permanent pressure loss | ~30 to 40 % of measured ΔP (between square-edge orifice 50–70 % and classical venturi 10–15 %) |
| Turndown | 1:3 standard / 1:7 to 1:10 with HART smart transmitter and multiple URL |
| Wetted material | 304 SS / 316 SS / 316L / 321 SS / 12CrMo / Cr5Mo / Hastelloy / Monel / Titanium by quote |
| Connection | Flange HG/T 20592 PN0.6 to PN42 MPa / ANSI 150 / 300 / 600 / 900 / 1500 lb / welded for DN1000 and above |
| Tap geometry | Corner taps / D and D/2 taps / flange taps per ISO 5167-3 (flange taps most common for DN50 to DN600) |
| Applicable media | Clean liquid, clean gas, saturated and superheated steam, natural gas, refined hydrocarbon, cryogenic liquids LN2 / LOX / LH2 / LNG / LAr; single-phase, full-pipe flow |
| DP transmitter (paired) | factory-supplied 4-20 mA / HART smart DP transmitter (factory option) or buyer-supplied Rosemount 3051 / Yokogawa EJA / Honeywell ST3000 / ABB 266 / Endress+Hauser Deltabar |
| Output signal (from transmitter) | 4-20 mA / HART / RS-485 Modbus RTU |
| Power supply (transmitter) | 24 VDC, 4-20 mA loop-powered (2-wire); 220 VAC for separately-housed signal converter |
| Ambient temperature (transmitter) | −40 to +85 °C standard; Ex d IIC T6 housing −40 to +75 °C |
| Hazardous-area certification | Ex d IIC T6 Gb (DP transmitter housing); primary element itself is passive, no Ex required |
| Ingress protection | IP65 standard; IP66 / IP67 by special order |
| Standards reference | ISO 5167-3 / GB/T 2624 (national equivalent); designed per the conventions used in ASME PTC 6 power-station main-steam practice and ISA-1932 long-radius profile |
| Calibration | ISO 9001 wet-flow calibration certificate from the factory loop; cert traceable to national flow standard |
| Lead time | 5–7 business days from factory |
Installation
Five field rules for an ISO 5167-conformant install and a stable DP reading.
- Honor the upstream straight-pipe length ISO 5167-3 sets the longest straight-pipe requirement on the site: at β = 0.5 expect 22 pipe diameters upstream of a single 90° elbow, scaling to 50 diameters for two out-of-plane elbows. Five diameters downstream is sufficient. Less straight-pipe means a swirling or asymmetric velocity profile and the discharge coefficient drifts off-cal. When the line cannot supply the run, specify a flow conditioner upstream or quote the integrated DP element with pre-cal in the as-installed geometry.
- Mount horizontally with impulse lines sloped to drain or vent Horizontal pipe orientation is preferred for liquid, gas, and steam. Impulse lines run downward to the transmitter for liquid (drains condensate to the transmitter pot), upward for gas (vents bubbles back to the line), and downward with seal-pot condensate columns for steam (standard practice). Vertical mount is permitted with flow direction marked on the element body.
- Match tap geometry to the order spec Three options per ISO 5167-3; corner taps (flush with the carrier ring), D and D/2 taps (one pipe diameter upstream / half a diameter downstream), or flange taps (25.4 mm = 1 inch from each face). Flange taps are most common for DN50 to DN600. The shop drilling matches the order code; do not field-drill alternate taps after install.
- Freeze-trace impulse lines in cold ambient When ambient drops below 0 °C and the medium is liquid or a condensable gas, the impulse lines must be steam-traced or electric-traced to prevent freeze-up. The build does not supply heat-trace; the buyer specifies and installs it. Total impulse-line length should stay under 5 m to minimize ΔP lag.
- Zero the DP transmitter at full pressure with flow stopped After install, with the primary element pressurized but the line flow stopped, open the equalizing valve on the manifold to zero both transmitter ports against the same static pressure, then run the transmitter zero sequence. Close the equalizing valve and open the two isolation valves to return the loop to service. Record the baseline offset for later trend audit.
Frequently asked questions
Specifying a flow nozzle for steam or high-velocity gas?
Send pipe ID, operating P + T, and min / normal / max flow. Engineering returns sized beta within one business day.